Oil storage tank No.12 in Sidra port was set ablaze due to the clashes that took place today and that fire fighting teams are trying to contain the fire, the NOC said on its website.

-----------------------

Turbine No.1 of El-Ruis power plant has been re-operated with a total output of 130 mega watt, the General Electricity Company announced on its Facebook page today, adding that turbine No.4 is still under maintenance and will be re-operated soon. 

-----------------------

Benghazi's Al-Nasir Basketball Club has won the Libyan Super Cup after beating Al-Ahli of Tripoli (56-46). The match was played in Tripoli yesterday.

News
Tagged: